|
1. SIRIM Technical Committee
Ar Steven Thang had attended the three Committee Meeting:
i. Technical Committee on Building Construction
ii. Pembangunan Bandar Bestari Committee Meeting
iii. Working Group on PP/PE Woven Fabrics and Bags Meeting
2.0 Complaints and Queries
| |
Sender |
Complaint/Query |
Reply/Action to be taken |
a.
|
Ooi Say Kow
11 May 2004
12 May 2004
|
Ooi Say Kow wrote to PAM
to request:
1. Approved plan by MPPP pertaining the so said 'changes'
or 'amendments' to the parapet wall by Dr. Wong Fook
Keong Engineers Associates of which Chong Kum Kwan
Architect should have submitted to MPPP for the CF.
PAM had replied that he could purchase a copy of the
plans from MPPP or from M/S Chong Kum Kwan Architect
or Dr. Wong Fook Keong Engineers Associates.
2. A list of alleged ambiguities pertaining the professional
plans that he viewed only Chong Kum Kwan Architect could
verify.
|
PAM to write standard letter to the Developer and
Architect for comments, and copy letter to Ooi Say
Kow.
|
b
|
Cliff Chen
|
Requested for opinion on
the enclosed photographs and video about a defect in
the building design (Lee Huat Plastics Industries Sdn
Bhd) which caused severe flooding of the office floor.
He requested for PAM to find solution since the problem
was still not resolved after repeated repairs.
|
PAM to inform that the Committee
is not in position to give opinion and advise Cliff
to verify with related party. Alternatively, he can
seek legal opinion from legal adviser or employ a Professional
Consultant. |
c.
|
Hew Foong Min
|
Bought a retail shop at Park Avenue, Damansara
from Medan Prestasi Bhd (a subsidiary of MK Land
Bhd). He needs interpretation on words "placed
in position" as stated in item 2(d) because
he thinks that both architect and developer are
taking their interpretation to the words was too
far.
|
Bought a retail shop at Park Avenue, Damansara from
Medan Prestasi Bhd (a subsidiary of MK Land Bhd).
He needs interpretation on words "placed in position"
as stated in item 2(d) because he thinks that both
architect and developer are taking their interpretation
to the words was too far.
The architect and developer are correct on their interpretation
of the words "placed in position".
.
|
d.
|
Mirage Home Sdn Bhd
|
The company are complained that Hilmi
Faridah Architects Sdn Bhd had not made the long overdue
payment to them for the supply, delivery and installation
of aluminium wood-coated windows and doors for the proposed
bungalow at Section 7, Shah Alam eventhough they had
sent many reminder. The company appealed PAM to investigate
this matter and to take the appropriate actions.
|
PAM to write standard letter to Hilmi
Faridah Architects Sdn Bhd for comments and copy letter
to Mirage Home Sdn Bhd.
|
3. Nomination of Official and Alternate Representative
| Name of Committee |
Official and alternate representatives
to attend / be nominated |
| PAM Rep |
Alternate Rep |
Current Rep |
SIRIM - JK Teknikal untuk
Penyediaan Standard Malaysia bagi 'Concrete and Concrete
Products'
|
Ar Ahmad Pauzi Jaapar
|
Ar Jerry Sum
|
|
SIRIM - Notice of Meeting - Technical
Committee on Building Design
Date: 01 June 2004
Time: 9.30 am
Venue: Bilik Gerakan, Blok 3, Tingkat 3, SIRIM Berhad
|
Ar Jerry Sum
Note:
Ar Steven Thang attended meeting on 01/06/04
|
Ar Steven Thang |
|
| Jabatan Standard Malaysia - Invitation
to ISO Conference on Social Responsibility, Stockholm,
Sweden
|
Ar Lim Pay Chye |
|
|
CIDB - Invitation to WG on Quality- Sub
W/Group for Quality Assessment Meeting
Date: 03 June 2004
Time: 10.00 am-12.30 pm
Venue: Technology Meeting Room, 8th Floor, Grand Season
Avenue, No. 72, Jalan Pahang, Kuala Lumpur
|
Ar Joseph Tan Meng Hooi
|
|
|
CIDB - Invitation to Prominent Player
Award - The Malaysian Construction Industry Excellence
Awards 2004 (MCIEA 2004)
Date: 26 May 2004
Time: 10 am
Venue: Bilik Mesyuarat CREAM, Tingkat 10, CIDB,
Grand Season Avenue, Jalan Pahang, Kuala Lumpur
|
Ar Paul Lai Chu |
|
|
| CIDB - JK Pembangunan Modul Latihan Untuk
'Safety Officer' yang Berdaftar Dengan JKKP |
Ar Chris Yap |
Ar Jerry Sum |
|
CIDB - JK Pemandu Bagi Industrialized
Building System Bil 1/2004
Date: 14 June 2004
Time: 2.30 pm
Venue: Bilik Lembaga, Ibu Pejabat CIDB, Tingkat 8, Grand
Seasons Avenue, Kuala Lumpur
|
Ar Lim Peng Keang |
|
|
| CIDB - Invitation to Taklimat Pembangunan
"National Occupational Skill Standard' (NOSS) Sesi
Occupational & Job Analysis" Bidang : 'Fire
Fighting System'
|
Regret |
|
|
9. CIDB - Invitation to WG on Quality
Meeting
Date: 08 June 2004
Time: 2.30 - 4.30 pm
Venue: Technology Meeting Room, 8th Floor, Grand Season
Avenue, No. 72, Jalan Pahang, Kuala Lumpur
|
Ar Paul Lai Chu
Note:
Ar Joseph Tan will be attending
|
Ar Joseph Tan |
|
|